2013 Diamond Drilling Summary
Hole Number | Easting | Northing | Elevation | Az. | Dip | Length | Target Name | |||||||||
SE-13-012 | 361470.0 | 2656072.0 | 194.0 | 170 | -45 | 145.6 | Rio Verde | Alteration zone was cut hosting disseminated and vein pyrite between 57.5 and 58.5 metres: 45.3 g/t Ag and 0.2% Pb |
||||||||
SE-13-013 | 361487.0 | 2656043.0 | 193 | 150 | -45 | 64.6 | Rio Verde | Between 44.0 and 50.0 metres: 232.3 g/t Ag and 0.33% Pb. |
||||||||
SE-13-014A | 364781.0 | 2661522.0 | 685.0 | 140 | -50 | 410.1 | El Secreto Vein |
Structure intersected around 222 metres: 4.95 g/t Au and 86 g/t Ag over 20 cm. |
||||||||
SE-13-015 | 364780.0 | 2661521.0 | 685.0 | 170 | -50 | 319.3 | El Secreto Vein |
Vein was cut at 284.8m. Minor pyrite and arsenopyrite. No significant results. |
||||||||
SE-13-016 | 364780.0 | 2661522.0 | 685.0 | 330 | -50 | 170.7 | North Vein | No vein intersected. | ||||||||
SE-13-017 | 361582.2 | 2661905.9 | 173.0 | 160 | -65 | 348.0 | Cerro Verde vein |
Multiple scattered Cpy-Bo-Mo Qz veinlets throughout the hole within the granodiorite. No significant results. |
||||||||
SE-13-018A | 356817.6 | 2659945.7 | 412.0 | 320 | -50 | 150.0 | El Molino Vein |
No significant results. | ||||||||
SE-13-019 | 356868.4 | 2660014.8 | 399.0 | 330 | -65 | 147.0 | El Molino Vein |
No significant results. | ||||||||
SE-13-020 | 356867.7 | 2659536.7 | 484.0 | 320 | -45 | 213.0 | Santos vein | No significant results. | ||||||||
SE-13-021 | 360252.8 | 2660374.5 | 270.0 | 160 | -45 | 246.0 | Corn Field Vein South |
Weakly mineralized horizon between 23.5 and 27.0 m: 0.44 g/t Au and 3.14 g/t Ag |
||||||||
SE-13-022 | 360223.0 | 2660474.0 | 245 | 160 | -45 | 201.0 | Corn Field South |
No significant results. | ||||||||
SE-13-023 | 360308.0 | 2660218.0 | 260 | 160 | -45 | 219.0 | Corn Field South | No significant results. | ||||||||
SE-13-024 | 360215.8 | 2660642.9 | 243.0 | 160 | -75 | 350.0 | Corn Field Vein |
Undercut Hole SE-12-001. Intersected 75 metres with close to 50% altered granodiorite with disseminated pyrite and arsenopyrite mineralization. |
||||||||
Total: | 2984.3 | metres |
Assaying for this program was completed by ALS Global through their office in Zacatecas, Mexico, which carries out the sample preparation. The pulps are sent by courier to their laboratories in North Vancouver. Gold was analyzed using a 30g fire assay with AA finish. A 51 multi-element suite using both ICP-MS and ICP-AES techniques was also used. A QA/QC program was in place from sample collection through to laboratory analysis. This included use of gold standards, blanks and duplicates. Samples chain of custody was monitored and reported at every stage.