OTTAWA, Ontario, Sept. 19, 2017 (GLOBE NEWSWIRE) — Orezone Gold Corporation (“Orezone” or the “Company”) (TSXV:ORE), at the request of IIROC, wishes to clarify certain disclosure in its September 18, 2017 news release titled “Orezone Provides an Update on the Bomboré Project.” In particular, the news release included disclosure relating to the exploitation of the Bomboré deposit and a historic mineral resource that is not a current mineral resource nor included in the resource statement in the Company’s most recently filed technical report available on SEDAR at www.sedar.com, and accordingly has been retracted.

Qualified Person(s)

Tim Miller, SME and COO, Pascal Marquis, Geo and SVP and Patrick Downey, PEng and CEO of Orezone, are Qualified Persons under National Instrument 43-101 and have reviewed and approved the scientific and technical information in this release, and verified any technical date disclosed in this release. Readers should refer to the annual information form of Orezone for the year ended December 31, 2016 and other continuous disclosure documents filed by Orezone since January 1, 2017 available at www.sedar.com, for this detailed information, which is subject to the qualifications and notes set forth therein.

About Orezone Gold Corporation

Orezone is a Canadian company with a successful gold discovery track record and recent mine development experience in Burkina Faso, West Africa. The Company owns a 90% interest in Bomboré, a fully permitted, undeveloped oxide gold deposit in West Africa, which is situated 85 km east of the capital city, adjacent to an international highway.

For further information please contact Orezone at +1 (613) 241-3699 or visit the Company’s website at www.orezone.com.

Orezone Gold Corporation

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION:

This news release contains certain “forward-looking statements” within the meaning of applicable Canadian securities laws. Forward-looking statements and forward-looking information are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “potential”, “possible” and other similar words, or statements that certain events or conditions “may”, “will”, “could”, or “should” occur. Forward-looking statements in this release include statements regarding, among others; the positive drill results from the current drilling program have potential to expand the resource, additional drill results will be released in October 2017, sensitive environmental areas could be reinstated;; completing of additional drilling and tests, completing a revised mineral resource in Q1 2018; and  completing a feasibility study early in the second half of 2018.

All such forward-looking statements are based on certain assumptions and analyses made by management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believe are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements including, but not limited to, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts to perform as agreed; social or labour unrest; changes in commodity prices; unexpected failure or inadequacy of infrastructure, the failure of exploration programs, including drilling programs, to deliver anticipated results and the failure of ongoing and contemplated studies to deliver anticipated results or results that would justify and support continued studies, development or operations. Readers are cautioned not to place undue reliance on forward-looking information or statements.

This news release also contains references to estimates of Mineral Resources and Mineral Reserves. The estimation of Mineral Resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral Resource estimates may have to be re-estimated based on, among other things: (i) fluctuations in the price of gold; (ii) results of drilling; (iii) results of metallurgical testing, process and other studies; (iv) changes to proposed mine plans; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible failure to receive required permits, approvals and licences.

Although the forward-looking statements contained in this news release are based upon what management of the Company believes are reasonable assumptions, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this news release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the Company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this news release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CONTACT: Patrick Downey,
President and Chief Executive Officer
Tel: 1 613 241 3699 / Toll Free: 1 888 673 0663
[email protected] / www.orezone.com